安成钢构
这是描述信息
/
/
/
Hohhot East Hailar Street-West Hailar Street-Jinhai Road renovation and upgrading project

Hohhot East Hailar Street-West Hailar Street-Jinhai Road renovation and upgrading project

The width of Hailar Central Bridge is 25.5 m, and the span is 40 m. This section is 1750 m long. The structure of the bridge is open box girder, which is built on the beautiful Zadagai River.
Retail price
0.0
Market price
0.0
Number of views:
1010
Product serial number
Category
Bridge
Quantity
-
+
Stock:
0
1
Product description

China Railway Construction Engineering Group Co., Ltd.

Project owner: Ruyi Development Zone, Hohhot

Work amount: More than 20,000 tons

Hohhot West Hailar Street-Jinhai Road renovation

The width of Hailar Central Bridge is 25.5 m, and the span is 40 m. This section is 1750 m long. The structure of the bridge is open box girder, which is built on the beautiful Zadagai River.

 

Scan the QR code to read on your phone

LISTEN TO THE VOICE OF EVERY CUSTOMER

Username used for comment:
客户留言
Description:
验证码

Contact Us

 

Address: Zibo City, Shandong Province

公众号二维码

Sweep and follow us

© 2019  Shandong Ancheng Steel Structure Engineering Co., Ltd.    鲁ICP备19041333号  Powered by www.300.cn

© 2019  山东安成钢结构工程有限公司 版权所有    鲁ICP备19041333号  网站建设:中企动力 淄博